Jiaxing, Zhejiang, China
Background
Jiaxing built this project to close gaps in hazardous-waste disposal capacity — part of the city’s “five-waste co-treatment” strategy covering household waste, construction waste, industrial solid waste, agricultural waste, and medical waste.
Solution
ENGOAL delivered: → Intelligent storage of hazardous materials → Automated transport → Fire monitoring & control system
Key equipment: → Forklift AGVs / lifts / conveyors / racking → Dual-spectrum infrared thermal imaging monitoring system → WCS
Operation logic:
- Hazardous materials flow automatically in and out, with forklift AGVs storing and retrieving loads on the racking.
- Fire monitoring system tracks hazard status in real time.
- A connecting corridor automatically conveys waste to the solid-waste incineration center, at 36,000 tons/year
Results
- Storage and conveying fully unmanned.
- AGV automatic picking-out with first-in-first-out— no long-term backlog.
- Infrared thermal imagingadded for early fire-warning.
Industry Value
Reference for hazardous-waste, chemical, and specialty-material warehouses where unmanned operation and continuous fire surveillance are non-negotiable requirements.






